日韩免费精品一级毛片-日韩免费精品视频-日韩免费黄色片-日韩免费观看视频-日韩免费观看-日韩免费高清一级毛片在线

PU Sandwich Panel Line - PIR Sandwich Panel Production Machine - Sinowa

Six conditions that need to be met in the construction of pu sandwich panel production line

Author: Sinowa/Post Date: 2021-08-02/Keywords: pu sandwich panel production line

Sinowa is familiar with the trends of the thermal insulation industry at home and abroad, and always brings effective first information to the readers. Today, I will bring you six conditions that need to be met for the construction of the polyurethane sandwich panel production line:

First of all, the polyurethane sandwich panel base wall should meet the requirements of the specification, and it has been checked and accepted.

pu sandwich panel production line

The construction of the polyurethane sandwich panel project should be carried out after the base layer is painted with a cement mortar leveling layer and the construction quality is qualified.

Before the construction of the thermal insulation project, the outer door and window openings should pass the acceptance, the size and location of the openings should meet the design requirements and the acceptance should be qualified. The door and window frames or auxiliary frames should be installed and waterproofed. The embedded parts and connectors of fire ladders, downpipes, various entrance pipelines and air conditioners that extend out of the wall should be installed, and the thickness of the polyurethane sandwich panel should be reserved.

pu sandwich panel production line

External wall scaffolding for the installation of insulation boards is required, and the scaffolding should be stable and reliable.

The ambient temperature during construction should not be higher than 35℃, should not be lower than 5℃, and should not be lower than 0℃ within 24h, and the wind should not be higher than level 5. Rainproof measures should be taken during construction in rainy days.

pu sandwich panel production line

The incoming materials of polyurethane sandwich panels should be stored in a dry and cool place, and the storage period and conditions should be in accordance with the requirements of the material supplier’s product description.

The above is the construction requirements for polyurethane sandwich panels brought to you today. Sinowa is engaged in pu sandwich panel line equipment and has unique insights on the process of color steel insulation panels. More customers are welcome to come to consult.

Page Url: http://www.owsqo.cn/en/six-conditions-that-need-to-be-met-in-the-construction-of-pu-sandwich-panel-production-line.html

You are here: Home / News / Six conditions that need to be met in the construction of pu sandwich panel production line
Contact Us
Email: sinowa@sinowa.cn
Call: +0086 151 0610 6366
Add: High-tech Industrial Development Zone, Zhenjiang, China
主站蜘蛛池模板: 风韵少妇性饥渴推油按摩视频| 2020年亚洲天天爽天天噜| 男女性色大片免费网站| 国产suv精品一区二区33| 亚洲成色在线综合网站| 亚洲日本一区二区三区在线| 色偷偷色噜噜狠狠成人免费视频| 色香影院| 亚洲国产日韩精品一区二区三区 | 精品久久久久久无码人妻热| 男人和女人做爽爽视频| 两性色午夜视频免费无码| 风韵多水的老熟妇| 亚洲精品美女久久7777777| 亚洲va无码专区国产乱码| 麻豆av福利av久久av| 妹子干综合网| 国产亚洲精品久久久久5区 | 熟女无套内射线观56| 狠狠干干干| 国产激情久久久久影院小草| 久久精品人妻中文系列| 性色成人网| 成人区人妻精品一区二区不卡| 性爽爽| 午夜精品久久久久久99热| 鲁一鲁一鲁一鲁一曰综合网| 又湿又紧又大又爽a视频国产| 国产丝袜美女一区二区三区| 三级欧美在线| 丰满人妻熟妇乱又伦精品| 亚洲大尺度无码专区尤物| 在线色资源| 中文无码一区二区三区在线观看| 欧美成人一区二免费视频软件| 看片在线| 国产一区二区内射最近更新| 日韩免费a级毛片无码a∨| 亚洲精品久久久久久婷婷| 强行交换配乱婬bd| 成人a级视频在线观看|